Abdul Nabi, M and El-adaway, I H (2022) A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Ahmad, R, Nauman, S and Malik, S Z (2022) Tyrannical Leader, Machiavellian Follower, Work Withdrawal, and Task Performance: Missing Links in Construction Projects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) Quantification of the State of Practice of Offsite Construction and Related Technologies: Current Trends and Future Prospects. Journal of Construction Engineering and Management, 148(07).

Assaad, R H, El-adaway, I H, Hastak, M and LaScola Needy, K (2022) The Impact of Offsite Construction on the Workforce: Required Skillset and Prioritization of Training Needs. Journal of Construction Engineering and Management, 148(07).

Brandalise, F M P, Formoso, C T and Viana, D D (2022) Development of a Typology for Understanding Visual Management Concepts and Their Relationships. Journal of Construction Engineering and Management, 148(07).

Chen, L, Zhang, J and Peng, W (2022) Research on the Hierarchical Discrete Time-Cost Trade-Off Problem for Program. Journal of Construction Engineering and Management, 148(07).

Jayaraj, S, Doerfel, M L and Williams, T (2022) Clique to Win: Impact of Cliques, Competition, and Resources on Team Performance. Journal of Construction Engineering and Management, 148(07).

Khan, M, Khalid, R, Anjum, S, Tran, S V and Park, C (2022) Fall Prevention from Scaffolding Using Computer Vision and IoT-Based Monitoring. Journal of Construction Engineering and Management, 148(07).

Kim, S, Hwang, S and Son, J (2022) Safety Management Guidelines for Precast Concrete Production Plants Using Importance-Performance Analysis. Journal of Construction Engineering and Management, 148(07).

Li, Y and Ning, Y (2022) Mitigating Opportunistic Behaviors in Consulting Projects: Evidence from the Outsourced Architectural and Engineering Design. Journal of Construction Engineering and Management, 148(07).

Li, Y, Soomro, M A, Khan, A N, Han, Y and Xue, R (2022) Impact of Ethical Leadership on Employee Turnover Intentions in the Construction Industry. Journal of Construction Engineering and Management, 148(07).

Li, Y, Wang, J, Cao, L, Wei, D and Wang, Y (2022) Three-Step Mathematical Model for Optimizing Rebar Cutting-Stock with Practical Application. Journal of Construction Engineering and Management, 148(07).

Mahmoud, S, Hussein, M, Zayed, T and Fahmy, M (2022) Multiobjective Optimization Model for the Life Cycle Cost-Sustainability Trade-Off Problem of Building Upgrading Using a Generic Sustainability Assessment Tool. Journal of Construction Engineering and Management, 148(07).

Martínez Fernández, P, Villalba Sanchís, I, Insa Franco, R and Yepes, V (2022) Slab Track Optimization Using Metamodels to Improve Rail Construction Sustainability. Journal of Construction Engineering and Management, 148(07).

Mucheti, A S and Albuquerque, P J R d (2022) Influence of Execution Speed on Displacements of Soil-Nailed Structures with Vertical Face in Urban Areas. Journal of Construction Engineering and Management, 148(07).

  • Type: Journal Article
  • Keywords: Reinforced soil; Retention; Horizontal displacements; Grout injection; Instrumentation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002286
  • Abstract:
    This paper presents the study of the execution speed influence on displacements of soil-nailed structures with a vertical face in urban areas, intended as the basements of buildings. Fifteen structures in the Metropolitan Region of São Paulo, Brazil, were evaluated. The main objective was to demonstrate the evolution of the construction technique, making its application possible in conditions considered by the technical community to be unfeasible due to the inevitable resulting displacements. The studied structures ranged from 6.8 to 22.7 m high. Soil-nailed walls were instrumented with displacement gauges (deflectometers) positioned near the top, which monitored the structures’ horizontal displacements. The execution time of each work was evaluated in terms of the sectoral excavation advancement, which was 3, 4, or 5 days, as well as the production in square meters per day. The results showed works that were less displaceable than the estimates proposed in the literature. The impact of execution speed also was evidenced, showing that the opening interval of new work fronts resulted in significant differences, with displacements ranging from 20 to 23 mm, from 10 to 15 mm, and from 0 to 6 mm, respectively. Two equations proposed to predict horizontal displacement based on the retaining structure height and daily work productivity are presented. The study can enable works that may be considered impractical if analyzed from the displacement premises of the literature; moreover, this study disseminates design and execution standards to obtain less-displaceable works.

Shi, M, Wang, J, Li, Q, Cui, B, Guan, S and Zeng, T (2022) Accelerated Earth-Rockfill Dam Compaction by Collaborative Operation of Unmanned Roller Fleet. Journal of Construction Engineering and Management, 148(07).

Shi, Q, Chen, X, Xiao, C and Han, Y (2022) Network Perspective in Megaproject Management: A Systematic Review. Journal of Construction Engineering and Management, 148(07).

Spearing, L A, Bakchan, A, Hamlet, L C, Stephens, K K, Kaminsky, J A and Faust, K M (2022) Comparing Qualitative Analysis Techniques for Construction Engineering and Management Research: The Case of Arctic Water Infrastructure. Journal of Construction Engineering and Management, 148(07).

Wang, X, Arditi, D and Ye, K (2022) Coupling Effects of Economic, Industrial, and Geographical Factors on Collusive Bidding Decisions. Journal of Construction Engineering and Management, 148(07).

Xiao, B, Wang, Y and Kang, S (2022) Deep Learning Image Captioning in Construction Management: A Feasibility Study. Journal of Construction Engineering and Management, 148(07).

Zhang, M and Ge, S (2022) Vision and Trajectory–Based Dynamic Collision Prewarning Mechanism for Tower Cranes. Journal of Construction Engineering and Management, 148(07).

Zhou, T, Zhu, Q, Shi, Y and Du, J (2022) Construction Robot Teleoperation Safeguard Based on Real-Time Human Hand Motion Prediction. Journal of Construction Engineering and Management, 148(07).